Tuesday, August 5, 2014

Dismantling California nuke plant will cost $4.4B

SAN DIEGO (AP) — Dismantling the San Onofre nuclear power plant in Southern California will take two decades and cost $4.4 billion, but spent radioactive fuel will be held at the site indefinitely, according to a game plan from Southern California Edison.

The price tag could make it the most expensive decommissioning in the 70-year history of the nuclear power industry, U-T San Diego reported (http://bit.ly/1oZUoTU ).

The plant was shut down in 2012 after a small radiation leak led to the discovery of extensive damage to steam-generator tubes that carried radioactive water. Edison, which operated the plant, closed it for good last year.

No comments:

Post a Comment

This is an unmoderated blog. Please be professional and respectful as you post.